DNVPiping CodeInternational

DNV-RP-F116

Integrity Management of Submarine Pipeline Systems

การบริหารความสมบูรณ์ของระบบท่อส่งใต้ทะเล

Organization
DNV
Category
Piping Code
Edition
Region
International
Last Reviewed
2026-07-01
Status
reviewed
1

Overview

Lifecycle integrity-management framework for submarine pipeline systems.

2

Scope & Applicability

Applies To Industries

OffshorePipeline

Covers — lifecycle integrity management of submarine pipeline systems: the integrity-management system, threat and risk assessment, inspection/monitoring strategy (ILI, ROV/AUV survey, cathodic-protection monitoring), and mitigation/response.

Does NOT cover (exclusions) — the design basis → DNV-ST-F101; the specialist design analyses → DNV-RP-F105/F109/F110.

F116 is the operate-and-maintain framework; the ST and design RPs cover concept-to-construction.

3

Key Requirements

F116 provides an integrity-management framework:

  • Management System — organization, processes, and documentation for pipeline integrity.
  • Risk/Threat Assessment — identify credible threats (corrosion, free spans, third-party, geohazards).
  • Inspection & Monitoring — ILI, external survey, and CP monitoring strategy by risk.
  • Assessment & Mitigation — response to findings and intervention decisions.
4

Technical Details

DNV-RP-F116 provides the framework for managing submarine pipeline integrity throughout operating life — the offshore counterpart to onshore integrity-management programs. It defines the management system, the threat and risk assessment, the inspection and monitoring strategy (in-line inspection, ROV/AUV survey, cathodic-protection monitoring), and how to respond to findings.

Where DNV-ST-F101 and its design RPs (F105/F109/F110) get the pipeline safely designed and built, F116 keeps it safe in service by directing inspection and intervention to the credible threats.

Engineering Note: Tie the F116 inspection strategy to the credible subsea threats — corrosion, free-span development, third-party damage, and geohazards — rather than a fixed survey interval, so limited ROV/ILI resources target where degradation actually occurs.

5

Engineering Notes

The DNV framework for managing subsea pipeline integrity through operating life — the offshore analog to onshore integrity-management programs. It defines the management system, threat/risk assessment, inspection and monitoring strategy (ILI, ROV survey, CP monitoring), and response to findings. Where DNV-ST-F101 and its design RPs get the pipeline safely built, F116 keeps it safe in service.

7

Source, Edition & Status

Publisher
DNV
Industries
Offshore, Pipeline
Last Reviewed
2026-07-01
Last Updated
2026-07-01
Verified By
Engineering content reviewer
Content Status
reviewed
Official Link
www.dnv.com
Disclaimer: Disclaimer: This page provides a simplified engineering reference only. It is not a replacement for the official standard. For design, inspection, procurement, and construction, always refer to the latest official standard and the applicable project specification.